Transition high-limit installation – Grain Systems PNEG-588-04 User Manual

Page 19

Advertising
background image

5. Installation

PNEG-588-04 Deluxe Downwind Heater Installation and Operation

19

Transition High-Limit Installation

1. Mark location on transition one foot up from the bottom (entrance collar) and centered in

the transition.

2. Drill or knock out 7/8" diameter hole on marked location.

3. Install transition high-limit using supplied self-drilling screws.

Figure 5H Sensor placement on transition connecting heater to the bin.

Advertising