Transition high-limit installation – Grain Systems PNEG-588-04 User Manual
Page 19
Advertising
5. Installation
PNEG-588-04 Deluxe Downwind Heater Installation and Operation
19
Transition High-Limit Installation
1. Mark location on transition one foot up from the bottom (entrance collar) and centered in
the transition.
2. Drill or knock out 7/8" diameter hole on marked location.
3. Install transition high-limit using supplied self-drilling screws.
Figure 5H Sensor placement on transition connecting heater to the bin.
Advertising