Decal sheet placement, Chapter 4 decal sheet placement – Grain Systems Tanks PNEG-1000 User Manual

Page 16

Advertising
background image

16

PNEG-1000 2.66" Commercial Tank Stiffener and Sidewall

4. Decal Sheet Placement

NOTE: The decal sheets are located in the second ring from the top. They are to be spaced evenly around

the diameter of the bin.

Figure 4A 2 Post (Two (2) rows of stiffeners used on each sidewall sheet.)

NOTE: On 3 post bins the top ring is not normally stiffened except for 42' diameter and larger bins with

stiffeners, (one per sidewall panel). Refer stiffener to sidewall attachment detail and specific gauge
sheet for the bin.

Figure 4B 3 Post (Three (3) rows of stiffeners used on each sidewall sheet.)

NOTE: Dashed lines represent stiffener locations.

NOTE: Dashed lines represent stiffener locations.

Advertising