4. Assembly Instructions
14
PNEG-1079 6", 8" and 10" Vertical Bin Unload Auger
Electric Motor Drive
1. Assemble a 3/4" nut onto threaded adjustment rod. Then thread adjustment rod into the 3/4" nut that
is welded onto the sleeve of vertical.
Figure 4C 6" and 8" Vertical
2. Slide motor mount plate onto pivot rod weldment of vertical. Install cotter pin to hold motor mount
plate place.
3. Attach belt guard to belt guard mounting brackets with four (4) 3/8" x 3/4" long HHCS and nylon
lock nuts.
4. 6" and 8": Attach hinged side chain guard to vertical with two (2) 5/16" x 3/4" long HHCS,
flat washers and nylon lock nuts. Hold chain guard closed by using a 5/16" flat washer and
wing nut.
10": Attach hinged side chain guard to vertical with two (2) 5/16" x 3/4" long HHCS, flat washers and
nylock nuts. Hold chain guard closed by attaching it to the lower chain guard using a 5/16" nylock nut.