Capacity, Clean-up, Storage preparation – Grain Systems Unload Augers PNEG-1079 User Manual

Page 22: Lubrication and maintenance

Advertising
background image

5. Operation Procedures

22

PNEG-1079 6", 8" and 10" Vertical Bin Unload Auger

Capacity

The results or capacities of screw conveyors or augers can vary greatly under diverse conditions. Different
materials, moisture content, amounts of foreign matter, angle of operation, methods of feeding and speed
all play a role in performance of the auger. Capacities listing in the

Chart below

will be achieved when

augering reasonably dry grain. Maximum possible capacity will be less with high moisture grain (above
15%) than with dry grain.

Clean-Up

1. Check to see that all guards listed in the assembly instructions are in place and secured

and functional.

2. Check all safety decals and replaced any that are worn, missing or illegible. The safety decals are

listed

on Pages 9

and 10

. Safety decals may be obtained free of charge from the dealer or ordered

from the factory.

3. Check to see that all fasteners are securely in place.

Storage Preparation

1. Close all wells to discharge tube.

2. Be sure the unload tube is empty.

3. Make sure power source is disconnected and locked out.

4. Check to see that all fasteners are secure.

Lubrication and Maintenance

The flange bearing on the head and tail ends of the auger should be lubricated at frequent intervals.

Check belt tension on motor drive belts for electric drive units.

Lubricate and check drive chain at frequent intervals. Adjust chain tension, if necessary.

Check to make sure all guards are in place.

Unit

Capacity BPH

6"

850-1250

8"

2000-2500

10"

3250-3750

Never clean, adjust or lubricate a machine that is in operation.

DANGER

Advertising