Install deck e, Deck a deck c – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1807 User Manual
Page 51

8. 16"-24" Head Platform Assembly
PNEG-1807 16"-24" Bucket Elevator Platform and Ladder “X” Series
51
Install Deck E
NOTE: The orientation of the flanges on Deck E is important to proper assembly. Deck E flanges should
be to the outside of Deck A and Deck C.
1. Locate Deck E. It is the smallest deck.
NOTE: Deck E will attach to Deck A, Deck C, both side toe boards and the main support channel.
2. Using a punch as needed for alignment, connect Deck E to the side toe board using 3/8" x 1" carriage
bolts (S-3585) with flange nuts (S-10028). Torque to standard specifications.
a. Deck E hole E1 to Deck A hole A5.
b. Deck E hole E2 to Deck A hole A4.
c. Deck E hole E3 to Deck C hole C5.
d. Deck E hole E4 to Deck C hole C4.
Figure 8H Deck E, Deck A and Deck C as Viewed from Underneath.
DECK A
DECK C