24" attach top clamp band to trunking – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1807 User Manual
Page 67

10. 4 x 5 Distributor Platform (Optional)
PNEG-1807 16"-24" Bucket Elevator Platform and Ladder “X” Series
67
24" Attach Top Clamp Band to Trunking
1. Slide rods of clamp rod weldment into inside set of holes of clamp bands for 24" assembly. Fasten
together using four (4) 1/2" hex flange nuts.
2. Line up the holes on the support channels with the inside set of holes on the 16"-24" long clamp clips
and fasten all four (4) together using eight (8) 1/2" x 1" bolt and nuts.
3. Assemble the 16"-24" long clamp assembly, clamp channel and clamp rod assembly at same time
around the trunking. Place clamp rod weldment assembly around the trunking leg and line up holes
on 16"-24" long clips and clamp channel with the outside set of holes on the clamp rod weldment.
Fasten all three (3) together using six (6) 1/2" x 1" bolts and nuts.
Figure 10C