Chapter 5 Safety Cage Assembly

48” Safety Cage Bell Section

1. Attach the vertical supports to the hoop half assembly from the final safety cage installation using 5/

16" x 3/4" bolts and nuts (with the heads on the inside of the cage).

2. Assemble the special bell safety cage hoop halves and attach to other end of vertical supports.

3. The vertical support must be bent at the flat area to allow for the angle of the bell section. Attach the

safety cage hoop brackets to the ladder as described in

Intermediate Safety Cage Hoop Assembly,

page 30

.

4. Once the safety cage hoop brackets are installed, attach the bell safety cage hoop half assembly to

the safety cage brackets and tighten bolts.

5. Once the safety cage hoop brackets are installed, attach the bell safety cage hoop half assembly to

the safety cage brackets and tighten bolts.

NOTE: The safety cage bell section is to be used at the point of termination of the safety cage and should

be just above the base platform (generally 7' to 8').

Pneg-1877 Top Dry Ladders, Safety Cage, and Platforms