Plugnplay, Smart ride, Installation – Airbagit Smart Ride User Manual

Page 3: Complete digital air management system

Advertising
background image

2

A I R B A G I T. C O M S U S P E N S I O N S

2 6 0 S . H I B B E R T, M E S A , A Z P H . 8 0 0 - 8 4 2 - 8 7 8 9

Smart Ride

COMPLETE DIGITAL AIR MANAGEMENT SYSTEM

Smart Ride

COMPLETE DIGITAL AIR MANAGEMENT SYSTEM

REMOVE SCREWS AND

ROTATE TOP BRACE TO

GAIN ACCESS TO THE

SMART-RIDE RELAY

CONTROL BOX

ROUTE HEIGHT SENSOR

LOOMS AND LCD

CONTROLLER CABLE

THROUGH GROMMET

ROUTE AIRBAG AIRLINES

THROUGH LARGE GROMMET

CHECKED VALVE INLET

PLUMB TO TANK

PLUG MAIN POWER

HARNESS IN BEFORE

CONNECTING THE LCD

CONTROLLER

FR

RL

FL

RR

PlugnPlay

INSTALLation

1. Disconnect the negative battery terminal.

2. Remove top of Plug n Play by removing external screws with supplied bit.

3. Mount the Plug n Play in a dry location. It is recommended that you leave 5.5”-6” of room free in front of the PnP

for valve removal.

4. Install tank and connect a line to the tank from the compressor and a second line back to checked inlet of the

PnP.

5. Route Airbag airlines through the large grommet and connect to the valves. See figure below for valve assign-

ments.

6. Run 8 gauge power wire to the battery and connect through the supplied 60Amp brearker. Also, make sure the

ground wire is connected to a clean part of the frame.

7. Connect the Smart-Ride’s White wire to the cars ignition.

8. Locate a safe position for the LCD controller to be mounted. The controller can also remain loose and be hand-

held. Make sure the controller isn’t in a position where it can be accidentally activated while driving.

9. Route the LCD controller wire loom from the controller to the Plug n Play. The loom will pass through the small

plastic grommet in the middle top of the Plug n Play. Do not plug LCD loom into the Relay control box yet.

10. Plug the Red and Black power connection into the Plug n Play.

11. Connect the vehicles battery.

12. Plug the LCD Controller into the Relay control box. The LCD display will turn on the run through its intialization

process. Once the LCD turns on the compressor will start filling the tank. The display will show the tank pressure

and the individual bag pressures. The height sensor will not display until they are connected.

13. Test the valves to make sure they are connected correctly.

14. Mount the height sensors (See Height Sensor Installation Section) and route wires through the

same grommet as the LCD loom. The height display for each corner will activate when the height sensor is

connected to the relay control box.

15. (Optional) Connect necessary “Optional Input Loom” to the third party controller. +12V Only

16. Calibrate the height sensors. (See Calibration Section).

17. Reinstall Plug n Play Top.