4) finishing the tiles – Factory Direct Hardware Toto ABA990X#01FCP User Manual

Page 21

Advertising
background image

21

(4) Finishing the tiles

●

Please build a deck around the perimeter with an apron and tiles.

❈

Before installing the deck, please fill the bathtub with water, test run it and check for leaks around the pipe
connections. Please refer to the POO concerning test runs.

❈

Before tiling the deck surface, determine the position of the remote control stand and insert a sheathing pipe for the
cable.

❈

Be sure to leave a gap in the space between the bathtub and the tiles and then fill in the gap between the bathtub
and the tiles using an alcohol-free type of silicone.

❈

Please arrange for a joint-backing material on site.
Also, when forming the deck apron, please be sure to affix the joint-backing material to the deck surface or the back
surface of the bathtub rim before putting the tub in place. It may not be possible to apply the joint-backing material
after the bathtub has been put in place.

Deck

Inspection port

(at least 15 x 15 inches)

Inspection port

(at least 15 x 15 inches)

Inspection port

(at least 15 x 15 inches)

Controller Stand Attachment Module

Tile insertion

Within

5 mm

Within

5 mm

Joint backing

material

Joint backing

material

Silicone

Silicone

Convoluted

Flexible

Tubing

Bathtub

within 3mm

Tile insertion

Advertising