34

■

Trial operation preparation

Cold water shut-off valve

Hot water

shut-off valve

Hot water heater

(Not included with the product)

Function module

Cold

water

water

Hot water

Power supply cord

(when flowing)

1

Confirm that electric power is

being supplied.

This should be performed after

confirming that the bathtub is empty.

2

Supply temperature: 140 to 158°F (60 to 70°C)

Supply pressure: 29 to 108.75 psi (0.20 to 0.75 MPa)

Supply water

pressure: 29 to 108.75 psi

(0.20 to 0.75 MPa)

(when flowing)

Open the hot and cold water shut-off valves connected

to the function module.

❈

The position of the water shut-off valve will vary from place to place.

Please supply hot and cold water to the function module by opening the shut-off valves.

Hot water

■

Trial operation

Please run the unit in order of operations (1) to (6).

❈

Do not apply pressure to the equipment itself.

(1) Bathtub data reset

➀

Open the bathtub drain valve and empty the bathtub.

➁

Set the On/Off button on the controller to OFF.

➂

Turn the to ON.

Please open the drain valve of the bathtub so that no water remains in the bathtub.
The draining operations will end automatically after approximately 2 minutes.