2 mechanical installation, 1 before starting, 2 side-by-side installation – GE Industrial Solutions AF-60 LP Micro Drive Operating Instructions User Manual

Page 10

Advertising
background image

2 Mechanical Installation

2.1 Before Starting

2.1.1 Checklist

When unpacking the frequency converter, make sure that the unit is undam-
aged and complete. Check that the packaging contains the following:

AF-60 LP

™ Micro Drive

Quick Guide

Illustration 2.1: Content of box.

2.2 Side-by-Side Installation

The frequency converter can be mounted side-by-side for IP 20 rating units and requires 100 mm or 3.94 inclearance above and below for cooling. Regarding
surroundings in general, please see chapter 7. Specifications.

Illustration 2.2: Side-by-side installation.

AF-60 LP™ Micro Drive Operating Instructions

DET-579A

9

2

Advertising