0 installation 5.1 mounting location, Typical installation, Parts locator – Xylem C3V CHEMICAL METERING PUMPS User Manual

Page 5: 0 unpacking, Extended brackets, Page 4 page 5, Foot valve, Tm tm

Advertising
background image

5.0 Installation

5.1 Mounting Location

Choose an area located near the chemical supply tank, chemical injection point,
and electrical supply. Install the pump where it can be easily serviced.

! Mount the pump to a secure surface using the enclosed hardware.
! Mount the pump close to the injection point. Keep the inlet (suction) and outlet

(discharge) tubing as short as possible. Longer discharge tubing increases the
back pressure at the pump head.

! Your solution tank should be sturdy. Keep the tank covered to reduce fumes. Do

not mount the pump directly over your tank. Chemical fumes may damage the
unit. Mount the pump off to the side or at a lower level than the chemical
container.

! Be sure your installation does not constitute a cross connection with the drinking

water supply. Check your local plumbing codes.

CAUTION: Always wear protective clothing, face shield, safety
glasses and gloves when working on or near your metering pump.
Additional precautions should be taken depending on the solution
being pumped. Refer to MSDS precautions from your solution
supplier.

Typical Installation

Foot Valve

Page 4

Page 5

C3

C3

CHEM-PRO

TM

tm

CHEM-PRO

C3V | Diaphragm Metering Pump

Made in the USA

MODE

PRIME

Program

Minimum

Maximum

Blue-White Ind.

IP66

NEMA 4X

Parts Locator

Mounting Bracket

Control Panel

Pumphead

Inlet (suction)

Outlet (discharge)

Junction Box

Priming and

Degassing Valve

tm

E

R

-P O

CH M

D p

C

M e

r

m

i g P

i

a

r

m

3

h

g

e

n

V

a

u

t

p

|

e i

h

tS

Mad

e U

n

A

E

MOD

P I

R ME

ra

P

g

m

ro

M n

m

u

i

i m

ax

M

u

im m

u

h

In

l

e

.

e W

t

-

d

B

i

P

I

6

6

M

N

4X

A

E

Suction Tubing

Injection /

Check Valve

Chemical Tank

Priming /
Degassing Tubing

Discharge Tubing

n Raise metering pump 4-1/2 inches (11.43 cm)

off the ground or a surface.

n Made out of tough Stainless Steel.
n Provides a stable mounting surface.

Blue-White’s Stainless Steel extended brackets allow the pump to be securely mounted to most
any surface; floor, shelf, or skid. The brackets lift the pump up 4-1/2 inches (11.43 cm), allowing you
to easily connect the suction side of the pump to your solution.

Model #

72000-380

Description

Extended Mounting Bracket, 1 Pair, SS, 4 SS Screws

Note: All diagrams are strictly for guideline purposes only. Always
consult an expert before installing the pump into specialized systems.
The pump should be serviced by qualified persons only.

4.0 Unpacking

Your pump package should contain the following:
1 - Metering Pump
1 - 8 foot / 2.4 meter suction tube, clear PVC
1 - foot valve & strainer assembly
1 - Injection fitting with internal back-flow check valve
1 - Mounting hardware kit (two mounting brackets, 4 screws)
1 - 5 Foot / 1.5 meter Priming Tubing

Extended Brackets

Model Number 72000-380

Advertising
This manual is related to the following products: