3 sample input power panels, Sample input power panels, Installation – Alpha Technologies PN-4 User Manual

Page 19: Primary service

Advertising
background image

3. Installation

19

031-103-B0-003 Rev. C

© 2002

TM

Neutral

Lightning

Protection

Service

Main

Line 1

Line 2

15A

15A

15A

50A

Grounding

Electrode

Conductor

BBX-100A-8POS

IPP-240-3

240V/15A

240V/15A

120V/15A

GFCI

240V/15A

Service and
Distribution

Load

From

Service

Supply

Main Bonding Jumper

G

N

Primary Service:

1) Main Bonding Jumper is Installed.
2) Grounding Electrode Conductor is Installed.
3) Lightning Protection is bonded outside of cabinet.

IPP-120-3

120V/20A

120V/20A

120V/20A

120V/15A

GFCI

Neutral

Lightning

Protection

Line 1

Line 2

15A

20A

20A

50A

Grounding

Electrode

Conductor

BBX-100A-8POS

20A

Service

Main

Service and
Distribution

Load

From

Service

Supply

Main Bonding Jumper

G

N

Primary Service:

1) Main Bonding Jumper is Installed.
2) Grounding Electrode Conductor is Installed.
3) Lightning Protection is bonded outside of cabinet.

3.3.3

Sample Input Power Panels

For more information on available models of the Input Power Panel, refer to "PN Series Options", section 4.4.

Figure 3-4; Schematic: Primary Service BBX-100A-8POS with IPP-240-3

Figure 3-5; Schematic: Primary Service BBX-100A-8POS with IPP-120-3