Installation, Continued, 3 sample input power panels – Alpha Technologies PN-4 User Manual

Page 21: Primary service, Secondary service

Advertising
background image

3. Installation

21

031-103-B0-003 Rev. C

© 2002

TM

3.3.3

Sample Input Power Panels,

continued

Neutral

Lightning

Protection

Line 1

Line 2

20A

Grounding

Electrode

Conductor

BBX-70A

IPP-240-1

Service and
Distribution

Load

From

Service

Supply

Main Bonding Jumper

G

N

Primary Service:

1) Main Bonding Jumper is Installed.
2) Grounding Electrode Conductor is Installed.
3) Lightning Protection is bonded outside of cabinet.

120V/15A

GFCI

240V/15A

Figure 3-9; Schematic: Primary Service BBX-70A with IPP-240-1

Figure 3-8; Schematic: Secondary Service BBX-70A with IPP-120-1

Neutral

Line 1

Line 2

20A

Equipment

Grounding
Conductor

BBX-70A

IPP-120-1

Service and
Distribution

Load

From

Feeder

Supply

NO Main Bonding Jumper

G

N

120V/20A

120V/15A

GFCI

15A

Secondary Service:

1) Main Bonding Jumper is NOT Installed.
2) Grounding Electrode Conductor is NOT Installed.
3) Lightning Protection is part of feeder supply.