Setup and operation, A fast eight-step process – Climax FF8200 FLANGE FACER User Manual
Page 6
Setup AND OperAtiON
A Fast eight-Step process
This model is so fast and easy to set up that an experienced operator can usually mount the machine into the
flange bore, align it, and start cutting in less than an hour.
1
Measure the
bore diameter.
This will be used
to determine
the leg length.
2
Select the
appropriate
leg length and
foot.
3
Install setup
fingers.
4
Tighten legs.
5
Set machine onto
flange using setup
fingers. Lightly
tighten leveling
feet in the flange.
6
Extend feet into
flange. Indicate,
level and tighten
leveling feet and
stationary feet.
7
Install tool bit.
Connect to
power.
8
You are ready
to begin
machining!
Climax Portable Machining & Welding Systems Web site: climaxportable.com
Worldwide Phone:
1.503.538.2185 N. America Toll-Free: 1.800.333.8311 Fax: 1.503.538.7600 E-mail: [email protected]
page 6