Storage, Installation, Location/clearances – AAON M3-094 User Manual

Page 38: Figure 2 - lockable handle, Caution

Advertising
background image

38

6. With permission of freight carrier, order

parts and/or make repairs.

7. Stay in contact with freight carrier to

ensure payment of your claim.


Nameplate should be checked to ensure the
correct model sizes and voltages have been
received to match the job requirements.

If repairs must be made to damaged goods,
then the factory should be notified before
any repair action is taken in order to protect
the warranty. Certain equipment alteration,
repair, and manipulation of equipment
without the manufacturer’s consent may
void the product warranty. Contact the
AAON Warranty Department for assistance
with handling damaged goods, repairs, and
freight claims: (918) 382-6196.

Note: Upon receipt check shipment for
items that ship loose such as filters,
thermostats and remote sensors. Consult
order and shipment documentation to
identify potential loose-shipped items.
Loose-shipped items may have been placed
inside unit cabinet for security. Installers
and owners should secure all doors with
locks or nuts and bolts to prevent
unauthorized access.

Figure 2 - Lockable Handle

The warranty card must be completed in full
and returned to AAON not more than 3
months after unit is delivered.

Storage
Indoor units are not designed for outdoor
use or storage. Equipment should be
protected from environmental conditions
such as rain, snow, humidity, extreme
temperatures and corrosive chemicals.

If installation will not occur immediately
following delivery, then store the equipment
in a dry protected area away from
construction traffic, and in the proper
orientation with all internal packaging in
place. Secure all loose-shipped items.










Installation


AAON equipment has been designed for
quick and easy installation.

Location/Clearances
Unit should be installed on a flat, level and
rigid surface which is capable of supporting
the weight of the unit, including water in the
coils. It is important that the unit be installed
level for drain pan and coil drainage.

The unit should be located so that there is
sufficient clearance for accessing doors and
panels. A minimum clearance of one unit
width is recommended on one side for coil
removal.


If the optional shrink wrap is selected
it should be left on units until placed
inside the building. Unprotected units
could

develop

corrosion

if

left

exposed to the environment.

CAUTION