Figure 6 - moving module with pipes, Figure 7 - neoprene gasket, Figure 8 - module connection – AAON M3-094 User Manual

Page 41: Figure 9 - module connection example

Advertising
background image

41

Figure 6 - Moving Module with Pipes

2. Remove module shipping covers. Check
to make sure neoprene gasket is installed on
downstream edge of each section. If any
neoprene gasket is damaged or missing it
should be repaired with 3/8” thick low-
durometer neoprene.

Figure 7 - Neoprene Gasket


3. Correctly orient the second section and
move it close to the first, while aligning the
two sections. The split unit lifting lugs
should be removed once there is no longer a
need to lift the section.

Figure 8 - Module Connection


4. Pull the two sections together using a
come-along attached to the lifting points on
the base rail.

Figure 9 - Module Connection Example


As the sections come together make sure the
integrated splice on the unit walls and roof
correctly overlap the walls and roof of the
adjoining module.














Advertising
This manual is related to the following products: