Operation, Startup checklist, Figure 33 - hydronic coil connections – AAON M3-094 User Manual

Page 58: Warning, Caution

Advertising
background image

58

drains. Remove the two bolts by each coil
connection. When replacing the cover, take
care not to over-tighten the bolts as this
could cause the rivet-nut to come loose.
Vents and drains are sealed with half inch
plugs.

All coils should be piped in a counter-flow
arrangement. The water entering connection
should be on the air leaving side of the coil.

Figure 33 - Hydronic Coil Connections












Operation





















Before starting up the equipment, building
construction should be complete. Startup
personnel should:
• Have a working knowledge of general
HVAC and mechanical commissioning
procedures and practices.
• Be familiar with unit functions, features,
optional unit accessories, and all control
sequences.
• Have appropriate literature on hand for
consultation.

Startup Checklist
• Check all electrical connections for
tightness.
• Inspect all sections. Remove any shipping
restraints and check for loose debris.
• Check fan set screws for tightness, turn
fan to assure free rotation.
• Ensure electrical supply matches unit
nameplate.
• Ensure condensate lines are connected,
glued, and sloped towards building drain.
• Manually fill any trapped drains.
(Condensate drains will fill automatically)


Improper

installation,

adjustment,

alteration, service or maintenance
can

cause

property

damage,

personal injury or loss of life. Startup
and service must be done by a
Factory Trained Service Technician.
A copy of this IOM should be kept
with the unit.

WARNING


Equipment

operation

during

construction

will

void

all

manufacturer’s warranties.

CAUTION

Advertising
This manual is related to the following products: