Operating the appliance, Putting the appliance into operation, Reading out measured values – DE DIETRICH MODULENS AGC 15, AGC 25, AGC 35 User Manual

Page 17: 4 operating the appliance, 1 putting the appliance into operation, 2 reading out measured values

Advertising
background image

4 Operating the appliance

4.1

Putting the appliance into operation

1. Turn on the boiler using the on/off switch.

2. The first time the boiler is powered up, the LANGUAGE menu is

displayed. Select the desired language by turning the rotary

button.

3. To confirm, press the rotary button.

The boiler will begin an automatic venting-programme (which lasts

approx. 3 minutes) and will do this every time the power supply is

isolated. If there is a problem, the error is displayed on the screen.

4. Check the water pressure in the installation shown on the control

panel display.

If the water pressure is lower than 0,8 bar, more water

should be added. If necessary, top up the water level in the

heating system (recommended hydraulic pressure

between 1,5 and 2,0 bar).

4.2

Reading out measured values

The various values measured by the appliance are displayed in the
#MEASURES

menu.

1. To access user level: Press the > key.
2. Select the menu #MEASURES.

4

Turn the rotary button to scroll through the menus or

modify a value.

4

Press the rotary button to access the selected menu

or confirm a value modification.

¼For a detailed explanation of menu browsing, refer to

the chapter: "Browsing in the menus", page 15.

8

22

24

20

l

0

C003159-A

Français - Deutsch - English -
Italiano - Espanol - Nederlands
- Pycck - Polski - Türk -

bar

1

1

2

2

D

STD

J

I

E

0

2

4

6

8

10

12

14

16

18

22

24

20

#

F

% $



!

LANGUE

FRANCAIS

C002286-C

bar

1

1

2

2

D

STD

J

I

E

0

2

4

6

8

10

12

14

16

18

22

24

20

#

F

AUTO

% $

<

:



!

SUNDAY 11:45

C002219-D-04

AGC 10/15 AGC 15 AGC 25 AGC 35

4. Operating the appliance

03/12/2013 - 300026080-001-03

16

Advertising