11 final preparations, 1 plug beam ends, 2 anchor feet to the floor – FlexLink WL322 (322 мм) Монтаж User Manual
Page 33: 3 other preparations

Final preparations
C
rea
ted by
EBCCW
00:
06
29
5683EN-1
11
Final preparations
11.1
Plug beam ends
Ensure that end caps (XCBE) have been fitted to all aluminium profile ends.
The beam profiles should be deburred before fixing end caps. It may be
necessary to tap the cap into position using a soft-faced hammer.
11.2
Anchor feet to the floor
After the assembly of all components it may be necessary to anchor the
conveyor support feet to the floor. Use a type of fastener that is right for the
kind of floor where the conveyor is installed.
Instability of the conveyor during operation may result in a dangerous op-
erating environment or damage the conveyor components.
11.3
Other preparations
•
Adjust the height of the structural beam if necessary.
•
Make sure that the installation is stable and that all screws have
been properly tightened.
•
Use a plummet and/or water-level to make sure that the construc-
tion is not askew.
•
Make sure that all electrical equipment is properly connected.
•
Make sure that the conveyor is running in the correct direction be-
fore starting the conveyor! Never run the conveyor with tightened
slip clutch until you have ensured that the running direction is cor-
rect.
•
Tighten the slip clutch to a suitable friction. (Slip clutch adjust-
ment, see page 66)
•
Make sure that the transmission cover is attached to the drive unit.
•
In pallet installations, make sure that all pneumatic equipment is
properly connected.
Remember that conveyor belt should always be pulled, not pushed, by the
drive unit.