5 electrical installation with cable gland – Burkert Type 8793 User Manual

Page 33

Advertising
background image

33

Electrical Installation

Type 8792, 8793

*** Connect the Pt 100 sensor via 3 cables for cable com-

pensation reasons. It is essential to bridge Pin 3 and Pin
4 on the sensor.

When the operating voltage is applied, the process controller is
operating.

→

Now make the required basic settings and actuate the automatic
adjustment of the process controller. The procedure is described
in chapter“16.3 Start-up Type 8793”.

14.5 Electrical installation with cable

gland

DANGER!

Risk of injury due to electrical shock!

▶ Before reaching into the device or the equipment, switch off the

operating voltage and secure to prevent reactivation!

▶ Observe applicable accident prevention and safety regulations

for electrical equipment!

WARNING!

Risk of injury from improper installation!

▶ Installation may be carried out by authorized technicians only and

with the appropriate tools!

Risk of injury from unintentional activation of the system and
an uncontrolled restart!

▶ Secure system from unintentional activation.

▶ Following installation, ensure a controlled restart.

Using the 4 – 20 mA set-point value input
If several devices of Type 8792/8793 are connected in series
and the power supply to a device in this series connection
fails, the input of the failed device becomes highly resistive.
As a result, the 4 – 20 mA standard signal fails.
In this case please contact Bürkert Service directly.

english

Advertising
This manual is related to the following products: