Job specification sheet – Hydrotech 6700 XTR Valve Downflow Automatic Water Softeners Service Manual User Manual

Page 3

Advertising
background image

Page 3

Job Specification Sheet

NOTE: Some options may not be available depending on valve model or other options chosen.

Circle and/or Fill in the Appropriate Data for Future Reference.

System Type:

Meter Immediate / Time Clock Delayed / Volume Override Delayed.

Volume Override Immediate / Meter Delayed Weekly Reserve.

Meter Delayed Variable Reserve / Meter Delayed Fixed Reserve..

.

.

.

Valve Type:.. .

.

.

.

56XT/6700

Proprietary C

Regenerant Flow:

Down Flow / Up Flow / Downflow Double Backwash / Up Flow Back Wash.

Filter / Up Flow Variable Flow

Display Format:

U.S. or Metric (French Degrees, German Degrees, or PPM)

Unit Capacity:

_____________ Grains/French Degrees/German Degrees/PPM

Water Hardness:

_____________ Grains/French Degrees/German Degrees/PPM

Capacity Safety Factor:

Zero or ______ %

Volume Override:

_________ (Gallons or M

3

)

Regeneration Day Override: Off or Every ______ Days
Regeneration Time:

Delayed _________ AM/PM or ______Immediate

Regeneration Cycle Step #1:. _._.:._._.:._._.

Regeneration Cycle Step #2:. _._.:._._.:._._..

Regeneration Cycle Step #3:..._._.:._._.:._._..

Regeneration Cycle Step #4:. _._.:._._.:._._..

Regeneration Cycle Step #5:. _._.:._._.:._._.
Media Volume:

_________ (CuFt or Liter)

Salt Dosage:

_________ (lbs/CuFt or grams/Liter)

BLFC Size:

_________ gpm

Auxiliary Relay:

Enabled or Disabled

Auxiliary Relay Start 1:.

.

_.:._._.:._._.

Auxiliary Relay End 1:..

.

_.:._._.:._._.

Auxiliary Relay Start 2:.

.

_.:._._.:._._.

Auxiliary Relay End 2:..

.

_.:._._.:._._

Chemical Pump:

Enabled or Disabled

CPO Aux Relay Volume:

_________ (Gallons or M

3

)

CPO Aux Relay:

_._.:._._.:._._

Flow Meter Size:

.75” Paddle

.75” Turbine

Generic Flow Meter:

Maximum Flow Rate: Add _ _ Gallons every _ _ Pulses

Advertising