CAME Krono-S5D Kit User Manual
Page 19
Advertising

18
STAGE 3
COMMISSIONING THE CONTROL PANEL
3.1 - Initial Wiring & Control Panel Setup
1.
Connect power terminals L1 - L2
and a suitable earth (L2 being LIVE!)
2.
Select the motor power setting on the
transformer to level 1 for
commissioning.
3.
Ensure that the motors are adequetely
earthed.
ZA4
Fig 18
Fig 19
Advertising
This manual is related to the following products: