CAME Krono-S5D Kit User Manual

Page 19

Advertising
background image

18

STAGE 3

COMMISSIONING THE CONTROL PANEL

3.1 - Initial Wiring & Control Panel Setup

1.

Connect power terminals L1 - L2
and a suitable earth (L2 being LIVE!)

2.

Select the motor power setting on the
transformer to level 1 for
commissioning.

3.

Ensure that the motors are adequetely
earthed.

ZA4

Fig 18

Fig 19

Advertising
This manual is related to the following products: