End of installation stage 3 – CAME Krono-S5D Kit User Manual
Page 24
Advertising

23
END OF INSTALLATION STAGE 3
PLEASE CHECK THAT YOU HAVE CORRECTLY:
Ref
Page
1. Set power setting, inserted motor
3.1
17
capacitors, set dipswitches for
commissioning, ensure wire link is fitted
between terminals 1 & 2 and 2 & C1.
2. Set the opening and closing times
3.2
18
for gates.
3. Adjusted the control panel.
3.3
19
4. If required, activated automatic closing
3.4
20
and safety photocells.
5. Programmed the remote to the
3.5
21
control panel.
Advertising
This manual is related to the following products: