5 reagents installation – Hach-Lange POLYMETRON 9240 Operator Manual User Manual

Page 51

Advertising
background image

49

Installation

4.4.5 Reagents installation

1.

Prepare the reagents according to

Reagent Preparation on page 137

. Install the reagent

canisters in their place and connect them to their respective tubes.

2.

Install and connect the conditioning solution (diisopropylamine). The diagrams show an
analyzer for non-cationic applications. Analyzers for cationic applications have a small pump
installed above and to the left of the reagent canisters.

3.

Install and connect the reactivation
solution (blue R label).

4.

Install and connect the auto calibration
solution (yellow CAL label).

Advertising