5 reagents installation – Hach-Lange POLYMETRON 9240 Operator Manual User Manual
Page 51
Advertising
49
Installation
4.4.5 Reagents installation
1.
Prepare the reagents according to
Reagent Preparation on page 137
. Install the reagent
canisters in their place and connect them to their respective tubes.
2.
Install and connect the conditioning solution (diisopropylamine). The diagrams show an
analyzer for non-cationic applications. Analyzers for cationic applications have a small pump
installed above and to the left of the reagent canisters.
3.
Install and connect the reactivation
solution (blue R label).
4.
Install and connect the auto calibration
solution (yellow CAL label).
Advertising