10 reference electrode installation, Installation – Hach-Lange POLYMETRON 9240 Operator Manual User Manual

Page 56

Advertising
background image

54

Installation

7.

For each channel, measure the pH in the conditioned sample to check if the pump ratios are
efficient enough to obtain a pH of around 11.0.

8.

If necessary, update the ratios of each channel to maintain a final constant pH of 11.0 ± 0.2.

4.4.10 Reference electrode installation

1.

Remove the reference
sensor from its box.

2.

Remove the plastic
reservoir from the bottom
(the storage solution is
KCl 3M) and install the
O-ring as shown.

3.

With care, turn the bottom
electrolyte tube ferrule
with a maximum ¼ turn to
lock it.

4.

Remove the plastic plug
on the entry port.

Advertising