Section 4
System startup
Important note: Correct installation of the system is necessary to
ensure malfunction-free operation. Prior to initial commissioning,
ensure the system has been correctly installed and only authorised
persons have access to the system.
On initial commissioning, ensure all internal and external
expansions are correctly registered in the controller system.
4.1 Initial commissioning
1. Ensure the filtration probe sc is completely and correctly
installed.
2. Switch on the analysis instrument and check whether the
filtration probe sc is correctly registered in the system.
3. Follow the instructions in the operating instructions for the
analysis instrument.
The filtration probe sc is then ready for use.