Installer's Check List
Revision D
Introducing SlideSmart DC
Intro-5
I
NSTALLER
'
S
C
HECK
L
IST
The following list provides a high level overview of the tasks involved in installing the SlideSmart DC gate
operator. Take a moment to review the list and check off the items as you complete the install.
?
Site Prep - concrete pad location/dimensions, distance from gate, chain height, and mounting
considerations: post or base extension, front or rear installation.
?
Make sure gate installation complies with ASTM F2200 Standard Specification for Automated Vehicular
Gate Construction. And, install the supplied WARNING sign on both sides of the gate.
?
Check for compliance with local codes, site conditions, and NEC standards.
?
Install operator - (on concrete pad use four ½ - 13 x 3.5in long concrete wedge anchors.)
?
Attach chain end bracket to gate at proper height.
?
Attach chain to end brackets and feed under SlideSmart idlers and over chain sprocket.
?
Tighten chain using tensioning bolts.
?
Verify chain is level with idlers and parallel to operator and gate.
?
Connect red wire to DC Power Switch.
?
Turn DC Power ON.
?
Complete Initial Setup Menu programming.
?
Install the target magnet and make sure it is in line with and passes by the target sensor so it can be
recognized by the software programming.
?
Connect AC Power.
?
Connect all accessory devices.
?
Set the Close Timer (through the User Menu).
?
Set gate speed, if applicable (through Installer Menu). Refer to START (Smart Touch Analyze and Retrieve
Tool) in the Reference section.
?
Set IES sensitivity, if needed (through Installer Menu).
?
Check the Smart DC Controller software version. If needed, upload the latest version from
www.hysecurity.com. See Smart Touch Analyze and Retrieve Tool.
?
Program changes through the Installer Menu depending on the accessory devices that you have installed.
?
Give a copy of the operator instructions to the end user. Show the end user how to:
•
Remove the operator cover. Turn the power off and on to demonstrate learn limits after DC/AC cycles.
•
Turn the DC power switch off, which disengages the motor, and manually push the gate.
•
Test the red Emergency Stop Button located on the side of the control box. It can be accessed through a
hole in the cover. See illustration on page S-8.
?
Take photographs of the completed installation site and save it in your business files.