Npacking, Perator – Controlled Products Systems Group SLIDESMART DC 10F User Manual
Page 28
Advertising

Unpacking the Operator
1-6
SlideSmart Installation and Reference Manual
Revision D
U
NPACKING
THE
O
PERATOR
Prepare the gate operator for installation. See Figure 1-8.
1. Open the top of the box and remove packing materials.
2. Cut open the box to access the operator.
3. Lift the cover up and off the base of the operator. DO NOT lift the cover by its lock.
Service Outle
t
115VAC, 15A
Cover
Base plate
Figure 1-8.
Lock
Advertising
This manual is related to the following products: