2 order of steps during commissioning – ADS-TEC VMT6008 User Manual

Page 12

Advertising
background image

VMT6008

11

© ads‐tec GmbH • Raiffeisenstr.14 • 70771 Leinfelden‐Echterdingen

 

 

Note: 

If the case is connected with earth potential at the provided PE contact (e.g. by connecting 
the PE contact with the device plug), the electrical insulation is no longer given. This also 
applies if the device is installed by using a metal retainer clip. 

If you want to have the device electrically insulated from the power supply, you 
have to use a method of installation that ensures appropriate insulation.

 

Pos: 18 /Datentechnik/Inbetriebnahme/Reihenfolge der Inbetriebnahme/Reihenfolge der Inbetriebnahme für VMT 60xx-Serie @ 1\mod_1222073159179_6.doc @ 4100 @

4.2 Order of Steps during Commissioning 

Removing the Lid from the Service Slot 

Loosen the undetachable screws on the service slot cover by using a Torx Tx10 wrench and subsequently remove 
the service slot cover from the device. 

 

Abb. 3:  

Connecting The Cables 

Please connect all required cables. Use grommets in this case, in order to install the cables correctly and to avoid 
any potential damage to the cables. 

 

Note: 

A cable installation kit, which includes grommets for several cable diameters, is 
available as an option. 

 