3 check for operational readiness – ADS-TEC VMT6008 User Manual

Page 13

Advertising
background image

VMT6008

12

© ads‐tec GmbH • Raiffeisenstr.14 • 70771 Leinfelden‐Echterdingen

Abb. 4:  

 

 

Warning: 

The indicated protection class is only fully guaranteed if the case cover is correctly 
installed! 

 

Pos: 19 /Datentechnik/Inbetriebnahme/Betriebsbereitschaft prüfen/Betriebsbereitschaft prüfen für OPC/CPC/PLC/OTC/ITC/VMT-Serie(+Monitore) / IPC 5100/5500/2400/1100 @ 0\mod_1158905578361_6.doc @ 381 @

4.3 Check for operational Readiness 

Check the device for any hidden damage potentially caused by improper transport, operating or storage 
conditions or by improper use or handling (e.g. smoke development from the device, etc.). If any damage is 
detected, the device must be put out of service immediately and protected from accidental switch‐on. 

 

 

Advertising