4.4 Installing the Split-Core Current Sensor Assembly

STEP 1: Each phase being monitored will require one two-piece current sensor

assembly. Therefore, a three-phase meter will require three (3) assemblies. Open the

two-piece current sensor assembly by releasing the nylon clamp using a flat head

screwdriver.

Fig. 3. Split-Core Current Sensor

STEP 2: Reassemble the current sensor assembly around the conductor(s) to be

monitored. Ensure the current sensor halves marked “Load” are both facing the load

side of the conductor. The colored arrow will be on the source side of the conductor

being monitored and MUST be pointed in a clockwise direction around the conductor

being monitored. Tighten the nylon clamp to complete the assembly.

Fig. 4. Colored Arrow Will Be On The Source Side

IMPORTANT:

When looking from the source side of the conductor(s) being monitored, you

should see the arrow on the current sensor assembly. The arrow should be

pointing in a clockwise direction around the conductor(s) being monitored. If

the arrow is not positioned on the source side, inaccurate readings will result.

M33213

LOAD

SOURCE