Ransburg – Ransburg No. 2 Process Handgun Electric Motor User Manual
Page 36
No. 2 Process Electric Motor Version - Maintenance
Ransburg
32
AH-13-01.1
Needle Packing Replacement
1. Complete steps 1 and 2 under “Needle Assem-
bly Replacement” in the “Maintenance” section.
2. Mount an 8 mm (5/16-inch) drill bit vertically
in a vise.
Scoring or chewing of the metal packing
seat in handle may cause permanent dam-
age, requiring handle replacement.
Figure 21: Needle Packing Assembly
5. Place the new packing (Item 52) on the needle
assembly (see Figure 21).
6. To install the needle assembly, with needle
packing, refer to steps 4 through 6 under “Needle
Assembly Replacement” in the “Maintenance”
section.
C A U T I O N
!
Item #
1
2
3
NEEDLE PACKING ASSEMBLY
(Figure 21)
Description
Handle Assembly
Needle Assembly
Needle Packing
3. Place the handle opening over the drill bit tip
and insert until the bit tip contacts packing.
4. Rotate the handle assembly until the drill bit
bites into the packing. Lift the handle assembly
(to withdraw the packing). Make sure all bits of old
packing are removed. Wash housing with solvent.