Operating procedure, Post-operation procedure – Robinair 16900 Refrigerant Identifier User Manual

Page 15

Advertising
background image

16900 Refrigerant Identifier

13

Operating Procedure

POST-OPERATION PROCEDURE

1. Disconnect the sample hose from the instrument sample inlet

port. Inspect the hose for signs of wear, cracking, oil fouling, or

obstruction, and replace if necessary. Clean the outside of the hose,

and coil and stow it in the storage case.

2. Inspect the sample filter white element outside diameter for the

presence of red spots. If any red spots are found, replace the sample

filter, as directed in the Maintenance Procedures on page 17.

3. Disconnect the power harness from the instrument, clean, coil, and

stow it in the storage case.

4. Clean any dirt, grime, oil, etc., from the outside of the instrument

with a moist rag. Do not use cleaning solutions or water on the

instrument. Stow the instrument in the storage case.

Advertising