29 7. operation – IAI America RCP3-RA2BR User Manual

Page 35

Advertising
background image

29

7. Operation

7.2.2

RA2AC, RA2AR, RA2BC, RA2BR (Ball Screw)

[1] Operation

Check the operational condition of pressing force F (N).
* For push & hold operations, movement speed is set at 5 mm/s.

[2] Push force

Check whether the operation is available by pressing force.
How to decide: The operation is available as long as the pressing force is in the ranges shown in the graphs.

RA2AC/RA2BC/RA2AR/RA2BR

push force

Lead 1

Motor: 20P

Push speed:

5 mm/s

P

u

sh f

o

rce (N)

Current-limiting value (%)

P

u

sh f

o

rce (N)

Current-limiting value (%)

RA2AC/RA2BC/RA2AR/RA2BR

push force

Lead 1

Motor: 20SP

Push speed:

5 mm/s

RA2AC/RA2BC/RA2AR/RA2BR

push force

Lead 2

Motor: 20P

Push speed:

5 mm/s

P

u

sh f

o

rce (N)

Current-limiting value (%)

P

u

sh f

o

rce (N)

Current-limiting value (%)

RA2AC/RA2BC/RA2AR/RA2BR

push force

Lead 2

Motor: 20SP

Push speed:

5 mm/s

RA2AC/RA2BC/RA2AR/RA2BR

push force

Lead 4

Motor: 20P

Push speed:

5 mm/s

P

u

sh f

o

rce (N)

Current-limiting value (%)

P

u

sh f

o

rce (N)

Current-limiting value (%)

RA2AC/RA2BC/RA2AR/RA2BR

push force

Lead 4

Motor: 20SP

Push speed:

5 mm/s

RA2BC/RA2BR push force

Lead 6

Motor: 20P

Push speed:

5 mm/s

P

u

sh f

o

rce (N)

Current-limiting value (%)

P

u

sh f

o

rce (N)

Current-limiting value (%)

RA2BC/RA2BR push force

Lead 6

Motor: 20SP

Push speed:

5 mm/s

Advertising
This manual is related to the following products: