IAI America ZR-M User Manual

Page 55

Advertising
background image

41

(12) Set the plate and pin constituting the adjustment jig as shown below to affix the axis in the reference

position.

































Installation method
[1] Insert the ball screw spline into the hole in the jig from below.
[2] Cause the D-cut surface of the ball screw spline to contact surface a.
[3] Cause the side face of the ball screw spline to surface b.
[4] Tighten screw c to affix the jig on the ball screw spline.

* At this time, confirm that the adjustment jig is vertical to the ball screw spline and that the D-cut

surface and surface a are in close contact with each other.

* Applicable screw: Hexagonal socket head screw M5
* Tightening torque: 20 [N

cm] (Reference)

[5] Insert the supplied shaft into the hole in the ZR unit.

* Keep holding the shaft, because the shaft will drop once you release your hand.

[6] Turn the ball screw spline until the supplied shaft lightly contact surface d of the jig.



 Be sure to press the emergency stop switch before setting the adjustment jig. If not, the robot may

malfunction and a serious accident causing injury or death may occur.

Warning

c

a

d

b

D-cut surface

Shaft

a

b

c

d

Advertising
This manual is related to the following products: