3 pre-installation preparation, 1 tools, 2 voltage select jumper settings – IEI Integration SRM_121_150 v2.02 User Manual

Page 47: Installation, Reparation

Advertising
background image

SRM Series/SRM-KIT Series Monitor

Page 37

5.3 Pre-installation Preparation

5.3.1 Tools

Before installing the SRM series industrial monitor, make sure the following tools are on

hand:

ƒ Phillips (crosshead) screwdriver: All the retention screws on the system are

Phillips screws.

ƒ Soft working mat: When the SRM series industrial monitor is installed, the

screen is placed on the working surface. It is therefore important to rest the

MPC industrial workstation on a soft at that cannot damage the LCD screen

on the front of the SRM series industrial monitor.

5.3.2 Voltage Select Jumper Settings

If the monitor comes with both 12V and 9 ~ 36V DC power connectors, the voltage select

jumper on the integrated AD board must be configured for the DC connector that is used

to power the monitor.

NOTE:

The default voltage select jumper is configured for a 12V power source.

Do not change the jumper setting unless a 9~36V DC power connector

is to be used as the monitor’s power source.

To properly set the voltage select jumper, the following steps must be completed:

Step 1:

Use a screwdriver to remove all the screws holding the rear panel to the monitor.

Step 2:

Remove the rear panel.

Step 3:

Locate the voltage select jumper.

Advertising