INSTALLATION

POWER WAVE® S350CE

A-3

SAFETY PRECAUTIONS

Read this entire installation section before you

start installation.

ELECTRIC SHOCK can kill.

• Only qualified personnel should

perform this installation.

• Turn the input power OFF at the

disconnect switch or fuse box

before working on this equipment. Turn off the
input power to any other equipment connected to
the welding system at the disconnect switch or
fuse box before working on the equipment.
• Do not touch electrically hot parts.
• Always connect the POWER WAVE® S350CE

grounding lug to a proper safety (Earth) ground.

-------------------------------------------------------------

SELECT SUITABLE LOCATION

The POWER WAVE® S350CE will operate in harsh
environments. Even so, it is important that simple
preventative measures are followed in order to assure
long life and reliable operation.

• The machine must be located where there is free

circulation of clean air such that air movement in
the back, out the sides and bottom will not be
restricted.

• Dirt and dust that can be drawn into the machine

should be kept to a minimum. The use of air filters
on the air intake is not recommended because nor-
mal air flow may be restricted. Failure to observe
these precautions can result in excessive operating
temperatures and nuisance shutdown.

• Keep machine dry. Shelter from rain and snow. Do

not place on wet ground or in puddles.

• Do not mount the POWER WAVE® S350CE over

combustible surfaces. Where there is a com-
bustible surface directly under stationary or fixed
electrical equipment, that surface shall be covered
with a steel plate at least .060” (1.6mm) thick,
which shall extend not less than 5.90” (150mm)
beyond the equipment on all sides.

WARNING

LIFTING

Both handles should be used when lifting POWER WAVE®
S350CE. When using a crane or overhead device a lifting strap
should be connected to both handles. Do not attempt to lift the
POWER WAVE® S350CE with accessories attached to it.

STACKING

The POWER WAVE® S350CE cannot be stacked.

TILTING

Place the machine directly on a secure, level surface or on a
recommended undercarriage. The machine may topple over if
this procedure is not followed.

INPUT AND GROUND CONNECTIONS

Only a qualified electrician should connect the POWER
WAVE® S350CE. Installation should be made in accordance
with the appropriate National Electrical Code, all local codes
and the information in this manual.

MACHINE GROUNDING

The frame of the welder must be grounded. A ground terminal
marked with a ground symbol is located next to the input
power connection block.

See your local and national electrical codes for proper ground-
ing methods.

HIGH FREQUENCY PROTECTION

The EMC classification of the POWER WAVE® S350CE is
Industrial, Scientific and Medical (ISM) group 2, class A. The
POWER WAVE® S350CE is for industrial use only. (See print
L10093 for further details).

Locate the POWER WAVE® S350CE away from radio con-
trolled machinery. The normal operation of the POWER
WAVE® S350CE may adversely affect the operation of RF con-
trolled equipment, which may result in bodily injury or damage
to the equipment.

• Lift only with equipment of ade-

quate lifting capacity.

• Be sure machine is stable when

lifting.

• Do not operate machine while

suspended when lifting.

FALLING