Pumptec ELECTRIC SPRAYER 12V User Manual

Page 12

Advertising
background image

12

Version 110112

Pumptec Operating Instructions and Parts Manual

12V ELECTRIC SPRAYER

tube. Slide plunger into one head assembly and then slide the

other head onto plunger. Place head and plunger assembly on

work surface with valves facing upward.

9. Adjust plunger slot position towards center and have slot fac-

ing work surface. Replace all valves, O-rings and white washers.

Refer to image and manifold label to understand proper orienta-

tion.

Figure 6

10. Place manifold on top of plunger and head assembly. It may

be necessary to move heads on plunger to have valves align with

valve pockets on manifold. Be careful to not lose the white wash-

ers in the manifold during reassembly.

Figure 7

11. Turn assembly over and place shorter bolt and washer

assembly into heads and tighten finger tight. DO nOT tighten

completely at this time.

Figure 8

12. Install black grease from included packet into corners and

center of plunger slot as shown.

Figure 9

13. Mount pump back onto motor and tighten mounting bolts to

14 ft•lbs. of torque. Tighten head bolts to 14 ft•lbs. of torque.

LUbricatioN

Apply 1.5 oz of suppliers black grease to the corners and center

of plunger slot at the time of service.

StoriNG

For extended storing, or between use in cold climates, drain all

pumped liquids from pump and flush with antifreeze solution to

prevent freezing and damage to the pump. DO nOT RUn

PUMP WITH FROZEn lIQUID.

Note:

Each system’s maintenance cycle will be unique. If

system performance decreases, check immediately. If no wear at

500 hours, check again at 1000 hours and each 500 hours until

wear is observed. Valves typically require changing every seal

change. Duty cycle, temperature, quality of pumped liquid and

inlet feed conditions all effect the life of a pump’s wear parts and

service cycle.

Note:

Remember to service the regulator/uploader at each

seal servicing and check all system accessories and connections

before resuming operation.

PrEVENtiVE MaiNtENaNcE chEckLiSt

check

daily weekly 50

hrs.

500

hrs.

1500

hrs.

3000

hrs.

Clean Filters

X

Water leaks

X

Descale Pump

X

X

Cam & Bearing

X

X

Seal Change

X

X

Valve Change

X

X

Advertising