Chap ter 1: getting started 5, What you need 5, Pc requirements 5 – Maple Systems OIT Family User Manual
Page 5: Getting started, What you need, Chapter 1

CHAPTER 1
Getting Started
The Getting Started chapter walks you through all the steps required to setup your OIT:
•
What You Need
•
Installing OITware-200
•
Creating an OITware-200 Project
•
Downloading an OITware-200 Project
•
Verifying the OIT is Operational
What You Need
The table, below, lists the items you need to configure and operate your OIT.
OIT3160A/4160A
OIT3100 and
OIT4100 Series
except
3160A/4160A
OIT3600
All Other
Models
Configuration Software OITware-200
OITware-200
OITware-200 OITware-200
Configuration Cable
(OIT to PC)
7431-0049
7431-0096
7431-0048
7431-0049
Personal Computer
1
User Provided
User Provided
User
Provided
User
Provided
Power Cable
6030-0009
6030-0009
Not Required 7431-0050A
½ Amp, 24 VDC
Power Supply
2
User Provided
User Provided
User
Provided
User
Provided
PLC
User Provided
User Provided
User
Provided
User
Provided
Controller Information
Sheet
The OITware-200 documentation includes Controller Information
Sheets which contain important information specific to each PLC.
Please locate the sheet that corresponds to your PLC.
Communication Cable
(OIT to PLC)
Refer to Maple Systems’ Price List for a list of available cables or build
your own using the cable diagrams available on our web site
(www.maple-systems.com).
1
Computer requirements include at least a 486SX/33MHz PC, 4MB RAM, 4MB
available hard disk space, VGA video controller, Microsoft Windows 3.1, and one
available RS-232 serial port.
2
The OIT4400 and OIT4450 require a fast start power supply.
Getting Started
5
1010-0099, Rev. 07