Spectra Precision Survey Pro CE v3.60 GPS User Manual User Manual

Page 87

Advertising
background image

Trouble Shooting

83

Mapping Plane with GPS and Conventional
Measurements

Objectives

This tutorial job will teach you:

How to use GPS Stake Out.

How to calculate combined scale factor for conventional

measurements.

How to coordinate conventional measurements on the mapping

plane.

How to use COGO functions with the combined scale factor.

Scenario

You need to lay out petroleum well site at coordinates specified in a
US State Plane map projection zone. Some total station
measurements will be used to add points to the project.

Procedure

1. Open

TDSControl_ORNorth.job.

2. Save this job as TdsControl_OrNorth COPY.job so the original file

is available for the next tutorial.

• Go to the Job, Settings screen. On the Measure Mode card,

make sure

Store GPS Raw Data

is set to

+ Rx. Raw.

On the

Post Process card make sure recording interval is turned on.

3. Check the horizontal and vertical projection.

• Go to Projection from the Survey menu. On the Horizontal

card notice the of the zone record selected for this job file.
Tap

6KRZ 'HWDLOV to review the numeric parameters for this

map projection zone.

• On the Vertical card notice the geoid model record and file

name used.

• To select a different map projection, tap 6HOHFW =RQH. On the

Mapping Plane Setup screen, you can select either a map
projection zone or a calibrated site as the new projection

Advertising