Star Water Systems S1101 User Manual

Page 8

Advertising
background image

8

TESTING OPERATION
1.

NOTE: Float switch on/off level has been preset

but should be checked by viewing through the toilet

inlet.

Temporarily connect the pump discharge pipe to the

house drain pipe and plug in pump

Temporary

Connection

To house

Drain

GFCI

Outlet

Toilet

Inlet

1

4 in.

Water

2. Fill the tank with 4 in. of water. Be sure the pump does

not turn on.

2

3. Add an additional 1/2 in. of water to the tank. The pump

should turn “ON” when the water level reaches 4-1/2

in. If “ON” level is correct, unplug pump, disconnect

temporary discharge piping and proceed to next section.

If “ON” level is incorrect, refer to Troubleshooting on

page 18.

4-1/2 in.

Water

3

Advertising