Installing the switches in an equipment rack – Allied Telesis Layer 3 Gigabit Ethernet Switch x600-24Ts-POE User Manual

Page 69

Advertising
background image

x600 Layer 3 Gigabit Ethernet Switch Installation Guide

69

Installing the Switches in an Equipment Rack

Perform the following procedure to install each switch in a standard
19-inch rack:

Note

Steps 1, 2, and 3 are optional. These steps provide instructions on
how to remove the snap-on plastic feet from the bottom of a switch.
You can leave the feet on.

1. Place the switch upside down on a level, secure surface.

2. Using a flat-head screwdriver, remove the snap-on plastic feet from the

bottom of the switch, as shown in Figure 30.

Figure 30. Removing the Feet

3. Turn the switch over.

4. Attach a rack-mount bracket to one side of the switch using four of the

screws that come with the switch, as shown in Figure 31.

Figure 31. Attaching Rack-Mount Brackets

1327

1

3

5

7

9

11

13

15

17

19

21R

23R

2

4

6

8

10

12

14

16

18

20

22R

24R

x600-24T

s/XP

Layer 3 G

igabit E

thenet

Switch

CLASS 1

LASE

R PRODU

CT

D/C

L/A

1000 LIN

K /

ACT

HDX /

COL

FDX

10/100 L

INK /

ACT

POR

T ACTIV

ITY

26

25

L/A

XFP

XFP

L/A

D/C

D/C

L/A

L/A

STAC

K

PRES

MSTR

L/A

1

2

SFP

21

22

23

24

1

3

5

7

9

11

13

15

17

19

21R

23R

2

4

6

8

10

12

14

16

18

20

22R

24R

FAULT

RPS

MASTER

PWR

STATUS

21

22

23

24

SFP

L/A

BUSY

READY

FAULT

SD

RESET

CONSOL

E

Advertising