Allied Telesis Layer 3 Gigabit Ethernet Switch x600-24Ts-POE User Manual

Page 81

Advertising
background image

x600 Layer 3 Gigabit Ethernet Switch Installation Guide

81

2. Remove the transceiver from its shipping container and store the

packaging material in a safe location.

3. Position the transceiver with the label facing up.

4. Slide the transceiver into the slot until it clicks into place. See Figure

40.

Figure 40. Installing an SFP Transceiver

5. For the x600-24Ts and x600-24Ts/XP switches, verify that the handle

on the SFP transceiver is in the upright position, as shown in
Figure 41, to prevent inadvertently removing the transceiver.

Figure 41. Positioning Handles on the x600-24Ts and x600-24Ts/XP

Switches

1331

23R

24R

CLASS 1

LASER PRODUCT

D/C

L/A

1000 LI

NK /

ACT

FDX

POR

T AC

SFP

21

22

23

24

1331

23R

24R

CLASS 1

LASER PRODUCT

D/C

L/A

1000 LI

NK /

ACT

FDX

POR

T AC

SFP

21

22

23

24

Advertising