Master-slave series operation, Ge 85, Operation – GW Instek PSW-Series User Manual User Manual
Page 85

OPERATION
85
5. Connect the master and slave unit in series as
shown above.
6. Reattach the terminal cover.
Note
Ensure load cables have sufficient
current capacity.
Re-attach the protection dummy plug when not in
use.
Master-Slave Series Operation
Master-Slave
Configuration
Before using the power supplies in series, the
master and slave units need to be configured.
1. Configure the OVP and OCP
settings for the master unit.
2. For each unit, hold the Function
key while turning the power on to
enter the power on configuration
settings.
A
W
V
W
%W
100
80
60
40
20
ISR
C C
DLY
ALM
RMT
C V
VSR
Function
OVP/OCP
Set
Output
PWR DSPL
Lock/Local
Test
PSW 30-36
360W
Voltage
Current
Multi-Range DC Power Supply
3. Configure F-93 (Master/Slave)
setting for each master/slave unit.
Unit
F-93
Master (local or series operation)
0
Slave unit (series)
4
4. Cycle the power on the units (reset the power).