3 deployment considerations – In-Situ Aquaculture Buoy Manual (purchased before 28 May 2013) User Manual

Page 8

Advertising
background image

8

Overview

FIGURE 1. Main components of the buoy

2.3

DEPLOYMENT CONSIDERATIONS

• Ensure that the DO sensor and brush are adequately submerged in

the pond (at least 2 feet deep), sufficiently away from the pond’s
edge or above the bottom of the pond.

• Do not carry the buoy by the conduit. Carry it by the float.

Otherwise you may damage the wiring.

• Anchor the buoy.

Solar panel

Transceiver

DO sensor, cleaning brush, and
cleanser dispenser

Battery box

Advertising
This manual is related to the following products: