3 deployment considerations – In-Situ Aquaculture Buoy Manual (purchased before 28 May 2013) User Manual
Page 8
Advertising
![background image](/manuals/367688/8/background.png)
8
Overview
FIGURE 1. Main components of the buoy
2.3
DEPLOYMENT CONSIDERATIONS
• Ensure that the DO sensor and brush are adequately submerged in
the pond (at least 2 feet deep), sufficiently away from the pond’s
edge or above the bottom of the pond.
• Do not carry the buoy by the conduit. Carry it by the float.
Otherwise you may damage the wiring.
• Anchor the buoy.
Solar panel
Transceiver
DO sensor, cleaning brush, and
cleanser dispenser
Battery box
Advertising
This manual is related to the following products: