To prepare for meter installation, follow these steps:
1 Close the meter's inlet-side valve
2 Open a faucet and wait until water flow stops, to depressurize the system Do not remove the meter until the

flow stops

3 Check valves and make necessary repairs to the curb (shutoff) valve or inlet side valve if necessary
4 Before installing or removing a meter, close the outlet-side valve to relieve pressure Protect the area around the meter

against potential spills or leaks that could occur

5 To replace an existing meter continue with Step 6 To install a new meter skip to Step 8
6 Loosen the meter couplings or flange bolts and remove the meter and the old gaskets in the coupling nuts You may

choose to replace the old gaskets with the provided 9/64" thick rubber gaskets

7 Clean the coupling nuts or flange bolts, removing any pipe dope or dirt from the threads or flange bolts
8 Check the existing setting for proper alignment and spacing Correct any misalignment and spacing in the setting
9 Place the connection gaskets inside the connection coupling nuts
10 Set the meter between the coupling nuts or in the flange pipeline, positioned so that the flow arrow on the meter housing

points in the direction of flow Registration should be upright

11. For 3/4" to 1" Straight

a Start the coupling nuts at the threaded meter ends Verify that the nuts are properly aligned to avoid cross-threading

or damage to the meter ends

b An effective method for starting a coupling nut is:

i Position the nut squarely against the meter's spud end
ii Turn the nut counterclockwise (in reverse) while holding the nut against the meter spud end When the first

threads on both the nut and the spud end coincide, you will hear a slight click and feel the nut move into the

starting position

iii Tighten the nut by hand until it is "hand-tight"
iv With an open-end wrench, apply a partial turn Do not over tighten For plastic swivel connections, a one-quarter

turn beyond hand-tight is usually sufficient

11. For 1-1/2" to 2" Elliptical Flange Ends

a With meter and gaskets in place, tighten the flange connection bolts Verify the nuts are properly aligned to avoid

damage to the flanged ends

12 After the meter is installed, open the inlet shutoff valve until the meter is full of water and ensure that there are no leaks

(The more flow you allow through the meter, appropriate for the meter size, the better )

13 Open the outlet valve until air is out of the meter and service line
14 Open a valve downstream of the meter and verify that no foreign debris in the water obstructs the operations of

the system

15 Make sure the meter is installed with the flow arrow on the meter pointing in the direction of flow Check the read on the

meter to make sure it is registering a positive number If it is not, make sure the meter is installed in the correct direction
a The meter is sent in Storage mode so that customers do not experience alarms during shipment or installation In

general, a meter may take up to 2 minutes to begin measurement once the meter senses a full pipe

b The meter itself does not require a quantity of flow to begin measurement, the meter just requires that the pipe is

cleared of air and filled with water If the customer is attempting to purge the meter at low flow rates, it would likely be

more difficult and take longer  

16 When the meter starts recording positive flow, note the meter read for your records