Top cable entry, Preparing for top cable entry (default) – American Power Conversion SYMF800KH User Manual

Page 15

Advertising
background image

Symmetra MW 800 kW 3 × 400/230 V Installation - 990-1510D

9

Top Cable Entry

Preparing for top cable entry (Default)

Cable entry in Top Cover of Input/Output Section.

Loosen the 8 bolts in both cable entry covers (4 bolts in each cover). Drill holes for the
grommets in areas shown. Install the grommets and re-fit the covers.

Install cable lugs on busbars. Use M12 bolts. Feed cables through the top grommets.

Connect L1, L2 and L3 to busbars where indicated.

N

N

L2 IN

L1 IN

L3 IN

L1 OUT

L2 OUT

L3 OUT

AC IN

AC OUT

BAT 1

BAT 2

92

93

95

90

91

94

L3 OUT

L2 OUT

92

93

90

91

94

95

L1 OUT

L3 IN

L2 IN

L1 IN

2.3 in / 58 mm

1.75 in /
44.45 mm

1.75 in /
44.45 mm

IN/OUT power cable (top entry)

AC IN cable
entry

AC OUT
cable entry

DC
cable
entry

DC
cable
entry

Top view

M6 Bolt

Top view

Advertising