Bottom cable entry – American Power Conversion SYMF800KH User Manual

Page 26

Advertising
background image

Electrical Installation: External Bypass Static Switch Wiring

20

Symmetra MW 800 kW 3 × 400/230 V Installation - 990-1510D

Bottom cable entry

Loosen the 8 screws to remove bottom covers. Drill holes for the grommets. Re-fit the covers
and install the grommets.

Feed the cables through the grommets. Connect cables at cable connection points.

Connect grounding electrode conductor to busbar locations.

~

~

Normal

UPS Summary

Normal

L1 IN

L2 IN

L3 IN

L1 OUT

L2 OUT

L3 OUT

X022

X021

X007

X010

X011

X008B

X008A

X012

X013

X014A

X014B

X017

X405

L1 IN

L1 OUT

L2 IN

L2 OUT

L3 IN

L3 OUT

Top view of bottom cable entry

Communication cable Port

Top view of AC IN & OUT
bottom cable connections

External Bypass SSW

2.3 in / 58 mm

1.75 in /
44.45 mm

1.75 in /
44.45 mm

Note

No drilling or cutting should take place inside the External Bypass SSW.

Advertising