MAXIM Installation Instructions

Page 44

© Mass Electronics Pty Ltd 2011

Edition 2.0 dated 20/11/2013

5-1 Overview

The commissioning process of the MAXIM Series controllers can only be performed once the

mechanical and electrical installation has been completed, and is intended to ready the controllers

for full operation. The subsequent sections provide detailed information and steps for the

commissioning process.

5-2 Inspect the Installation

This section of the manual provides detailed steps to perform the final inspection of the installation

process. It is highly recommended that you perform a complete inspection of the mechanical and

electrical installation process to ensure proper operation of the MAXIM Series controllers.

5-2.1 Mechanical Inspection

Please check the following items to complete the mechanical inspection of the installation process:

• Debris such as dust, metal chips, and moisture may have accumulated on the controllers

during the installation process. Please ensure that all controllers are free of any such debris by

thoroughly cleaning as necessary.

• Verify that all controllers are properly installed on DIN rail.

• Verify that cables entering and leaving the cable ducts do not make overly tight bends.

• Verify there is safe access to all MAXIM Series controllers for operation and maintenance.

• Verify that all controllers are installed in a location that is NOT subject to temperature extremes

beyond the normal operating temperature.

• Verify that all controllers are located clear of high current or high voltage cables, and away from

sources that may cause electrical interference.

Customers are encouraged to contact Innotech Control Systems Australia or your nearest authorised distributor for

any clarification or further information regarding the installation process.

NOTE

To prevent injury to personnel and damage to equipment, all electrical power must be turned OFF before starting

the commissioning process. This includes power to the MAXIM Series controllers, and power to the input and

output circuits and equipment. When working with live power ensure that all electrical safety standards for work

on live electrical systems meet local regulatory requirements. Do NOT apply power to any controller or circuit until

instructed to do so by the steps in this section.